HEBRON WASTEWATER TREATMENT PLANT

Employer: Palestinian Industrial Estates & Industry Free Zones Authority (PIEFZA)

Project Location: Hebron, West Bank

In Progress

Scope of Work:

  • DSI Contract (Design, Supply and Installation) comprises the preparation of detailed design and working drawings, the construction of the facilities including supply and installation of the entire electro-mechanical equipment and SCADA system, and the tests and commissioning of the facilities.
  • Average daily flow capacity of the plant is 22.500 m³/day (225,580 people equivalents).
  • Design of the wastewater treatment plant is based on a single stage activated sludge process with extended aeration, nitrification, denitrification and the phosphorus removal including biological and chemical removal. The sludge stabilization will be performed by anaerobic sludge digestion.
  • Upon completion of the DSI Contract, the Contractor will provide Operation and Maintenance Services (O&M) for a period of 5 years, including staff and consumables.