Employer: Ministry of Agriculture of Georgia
Location: Tbilisi, Georgia
Date of Completion: 10.08.2018
Scope of Work:
• Restoration of the instrumental monitoring system of the scheme hydro technical structures, its reservoir, dam and the main canal.
• Rehabilitation of the open sections of Main Canal 7.97 km; of the concrete parabolic chutes – 1.9 km and closed sections of canal (gallery) – 407 m.
• Rehabilitation of 4 inverted siphons.
• Earth works – 244608 m3
• Mass concrete, reinforced concrete and precast slabs – 1600 m3
• Steel pipes – 18099 m
• Polyethylene pipes – 3180 m