LAMAS III - IV HYDROELECTRIC POWER PLANT

Employer: TGT Enerji Üretim & Ticaret A.Ş.

Consultant: Coyne and Bellier Engineering Ltd. Co.

Project Location: Mersin, Turkey

Date of Completion: 05.06.2009

Scope of Work: Lamas III – IV HEPP Project is designed to produce energy by gravity of water with drop height of 575 m between the altitudes of 653 m and 78 m on the Lamas River which is situated in Erdemli, Mersin. The project consists of two power plants of total installed power 37 MW and averagely 120 GWh energy is planned per year. The works include the construction of a regulator, conveyance tunnel (I-II), conveyance line (I-III), pressure pipeline (III—IV), and power house (III-IV).